Granite Street Softball Field and Concession Stand

Overall Scope of Work:

The new wing of the Portsmouth Middle School project will require much of the Alumni Field area that is used by many city residents and programs and replacement of that field was a condition of lifting the deed restriction. It was decided that the new field would be built on city-owned land at Granite Street. Commencing the summer of 2010 will be the building of a new regulation softball field, concession stand, playing lights, parking, associated fencing, and walkways. The demolition of the existing Wentworth School will be the first order of business in order to make room for the new construction.



Current Events:

  • Abatement of the existing Wentworth School completed 9/24/10
  • Demolition of Wentworth School complete 10/12/10  
  • Tree clearing and topsoil complete
  • Installation of all drainage structures to be completed by 1/7/11
  • Installation of underground utilities is complete
  • Concessions stand foundation has been poured

  • Sewer pump station installed

  • Under-slab plumbing and electrical work complete

  • Musco light poles and lights installed

  • Steel scoreboard supports/concrete foundation and motorcycle pad have been poured

  • Concessions stand concrete slab complete

  • Installation of barrier netting and outfield fencing complete
  • Underground electric wires installed
  • Rain garden work to be completed week of 6/6/2011
  • Scoreboard installed week of 5/23/2011
  • Parking lot binder course completed.  Top coat and striping to be completed in October 2011
  • Irrigation system and sod installation complete 6/22/2011 
  • CMU concessions stand building masonry complete
  • Concrete sidewalks/concessions building pad complete
  • Landscaping and plantings 100% complete
  • All fencing and guardrails 100% complete
  • Roof truss system/roof installation complete
  • 40 foot flag pole with dual down-lights installed
  • Underdrain work in outfield completed week of 10/3/2011
  • Installation of concessions stand interior finishes and fixtures to be complete
  • Final Cleaning of building and site completed